| Fixed: Study Specific ORAs can now be saved on a study in IREx Setup. |
| Fixed: Users not affiliated with sIRB/ lead site can be added as SMs on a study. |
| Fixed: Correct logic for displaying “waive” option in approval dialog. |
| Fixed: Multi-site Liaisons can validate PI Survey. |
| Fixed: Errors saving site amendments. |
| Fixed: Add and save Coordinators in Participating Site Dialog. |
| Fixed: Able to edit review and uncheck consent as “waive”. |
| Fixed: Separate Admin study comments and site comments. |
| Fixed: “Re-enlist” button for the sIRB/ SM to add site that previously declined back on study. |
Category Archives: System Enhancements/ Bug Fixes
Bug Fixes – November 1, 2021
| Fixed: Fixed the ability to sort documents by Type, Name, Date Added, and Size on past and current approvals. |
| Fixed: IRB approvals show all documents in one view. |
Bug Fixes – October 4, 2021
| Fixed: PIs and Coordinators can view approval documents on Study-wide IRB Approvals Tab |
| Fixed: Study team members from the non-primary FWA of a combo site can view approval documents |
Bug Fixes – September 13, 2021
| Fixed: “Other” textbox works when documenting a study closure |
| Fixed: Documents attached to surveys included in API documentation |
| Fixed: “Confirm SSRP” step shows on To Do column of Reviewing IRB Dashboard |
| Enhanced: Updated date validation on study closure dialog |
| Fixed: One site of combo site declining engagement fully dissolves combo site |
| Fixed: Multisite Liaisons can edit/add study team members to studies |
Bug Fixes – July 23, 2021
| Fixed: Multisite Liaison can edit previously completed HRP survey |
| Fixed: Participating Sites Removed from Study email does not send when sites with no IREx access are removed from a study |
Bug Fixes – July 6, 2021
| Fixed: Institutional Profile opens from Site-specific Approvals Tab. |
| Fixed: Documents carried over from previous approval maintain correct upload date. |
| Fixed: Site-specific Info menu shows all options for Relying HRPP liaisons. |
| Fixed: Component sites can be added to a study if the main FWA has registered for the study. |
| Fixed: Event log opens for large studies. |
| Fixed: A combo site that registers as a singular site shows as a single site on the Status Summary tab |
| Fixed: Removed error when logging in for the first time and agreeing to Terms of Use. |
| Fixed: Status Summary export shows correct LOI status for component sites. |
Bug Fixes – June 11, 2021
| Fixed: “Your Profile” and “Verify Study Team” dialog tabs open on next page. |
| Fixed: Agreements YouTube video displays correctly on IREx Setup. |
| Fixed: Blank tabs on Multisite Liaison’s page to Verify Study Team Contact are removed. |
| Fixed: The site amendment dialog has been restored to require sIRB review dates. |
Bug Fixes – April 2, 2021
| Fixed: Study Manager and SIRB are cc’d on all site approval emails when multiple sites are uploaded at once; not just first site approval email. |
| Fixed: The email “Time to upload Continuing Review to IREx” includes the PI if the PI is also the Study Manager. |
| Fixed: The publish approval checkbox is reinstated on the upload approvals dialog for the lead site. |
| Fixed: New Study Managers receive a temporary password email when their account is created. |
| Fixed: When searching for studies, spaces entered in the search box are persevered generating proper search results. |
| Fixed: A validated PI Survey no longer says the HRPP needs to validate it. |
| Fixed: Blank boxes are removed from the Site-specific Approvals tab. |
| Fixed: The versions box includes links to site-specific amendments, when needed. |
| Fixed: Hide the multisite liaison dashboard (“Your Sites” tab) when the Liaison is acting as the sIRB. |
| Fixed: sIRBs and Study Managers can now break/delete combo sites from the Participating Sites dialog. |
Bug Fixes – March 2, 2021
| Fixed: Liaisons and Study Managers are carbon copied (cc’d) on all site approval emails. |
| Fixed: Agreement checker reflects sites that have executed agreement with the named SIRB. |
| Fixed: Sites that have signed SMART IRB version 2 display “SMART 2” on the Status Summary tab. |
| Fixed: Multisite Liaisons do not see the Multisite Liaison Dashboard (“Your Sites” tab) when serving as the SIRB. |
| Fixed : All Lead Study Team contacts are carbon copied (cc’d) on all site approval emails. |
Bug Fixes – January 4, 2021
| Fixed: Download All button works for approvals with large volume of documents |